Local government asset management is often undertaken from an operational and engineering lens, but the accounting and financial aspect is also critical. Why is there often a disconnect between the two areas in local governments organisations in particular? 

The Nature of the Disconnect

At its core, the problem is that two professional communities, engineers and accountants, are looking at the same physical assets through fundamentally different lenses, using different languages, different time horizons, different performance metrics, and different organisational reporting lines. Neither is wrong in its own terms. The problem is that local government rarely builds the institutional architecture to reconcile the two perspectives into a single, coherent asset management discipline.

Different Professional Cultures and Languages

Engineers and asset managers think in physical terms: condition ratings, remaining useful life, maintenance cycles, failure modes, load-bearing capacity, and service levels. Their instinct is to ask, “what does this asset need?” Accountants think in financial terms: depreciation rates, carrying values, fair value assessments, impairment, and balance sheet presentation. Their instinct is to ask, “what does this asset cost?”

These are not incompatible questions, but they are rarely asked in the same room. A civil engineer assessing a stormwater pipe thinks about invert levels, structural integrity, and the cost of lining versus replacement. The finance and accounting officer thinking about the same pipe thinks about whether it has been revalued in accordance with the applicable accounting standard, whether accumulated depreciation has been correctly calculated, and whether it is correctly classified on the asset register. They may never directly communicate about that pipe at all.

This professional silo effect is reinforced by training pathways, professional associations, and career progression routes that rarely cross. An engineer rising through a council’s infrastructure department has little reason to develop financial literacy beyond basic project budgeting. An accountant and finance professional working in council finance has no training in condition assessment methodology. The two disciplines share an asset register, but they often populate different parts of it, in different systems, with different update cadences.

Eliminate the Ellipses Phases

In most Australian local councils, asset management sits within an infrastructure, engineering, or works directorate. Financial management sits within a separate corporate services or finance directorate. The two typically report to different directors, who report through different pathways to the CEO or general manager.

This structural separation means that information flows vertically within silos rather than horizontally between them. When a capital project is completed, the works team knows when it was built, what it cost to construct, and what it is designed to do. The finance and accounting team needs to know the capitalisation date, the componentised cost breakdown, the expected useful life of each component, and the residual value, none of which is automatically produced by the project management systems used by the engineering side.

The handover of a completed asset from construction to operations to the balance sheet is therefore a notoriously problematic moment in local government. Assets are frequently capitalised late, capitalised at incorrect values, or not componentised at all, because there is no systematic process for the engineering and finance and accounting teams to reconcile what was built with what needs to be recorded. The NSW Audit Office repeatedly identifies this as a primary driver of errors in council financial statements, as reflected in the finding that 84% of uncorrected errors in 2024–25 relate to the measurement and recognition of infrastructure, property, plant and equipment.

Different Time Horizons

Engineers think in decades. Infrastructure asset management is inherently long-term, a bridge might have a 100-year life, a water main 80 years, a building 50 years. Sound engineering asset management means planning renewal cycles 10, 20, and 30 years out, modelling deterioration curves, and building long-term capital works programs that reflect genuine infrastructure needs.

Accountants, by contrast, operate on annual cycles. The financial year is the organising unit of their professional world. Budgets are set annually. Financial statements are prepared annually. Audits occur annually. There is a natural tendency within finance functions to focus on what needs to be reported now rather than what the infrastructure stock will need in 2045.

This time horizon mismatch creates a systematic bias in local government financial planning. Long-term infrastructure renewal needs, which might be quantified in a 10-year asset management plan, rarely translate with full fidelity into the annual budget or the long-term financial plan. The engineering team produces a renewal forecast; the finance team finds the numbers confronting, moderates them against what is politically or fiscally achievable in the short term, and the resulting capital works budget understates genuine infrastructure need. Over time, this produces the infrastructure renewal gap that is endemic to Australian local government, an accumulated backlog of deferred maintenance and renewal that grows silently on balance sheets. National infrastructure assessments have repeatedly highlighted significant maintenance and renewal backlogs across Australian public infrastructure, including local government networks. 

The Depreciation Paradox

Depreciation is where the two professional disciplines most dramatically fail to connect, and it is arguably the single most important governance failure in local government asset management.

From an accounting perspective, depreciation is a charge that systematically allocates the cost of an asset over its useful life. It reduces the carrying value of an asset on the balance sheet and is recognised as an expense in the operating statement. It is a non-cash charge, no money actually leaves the council’s bank account, but it signals the progressive consumption of the asset’s value and, conceptually, the amount that should be set aside to fund future renewal.

In theory, a council that correctly depreciates its asset base and funds that depreciation charge through its rates and charges is building the financial capacity to renew its infrastructure when assets reach the end of their useful lives. This is the financial model on which the sustainability of local government is premised.

In practice, this model breaks down almost everywhere in Australian local government for several interconnected reasons. First, depreciation rates are often set using assumed useful lives that bear little relationship to actual engineering conditions, if an asset register says a road has a 40-year life, the depreciation charge is based on that assumption, regardless of whether the road was poorly built, heavily trafficked, or inadequately maintained and will in practice need renewal in 25 years. The engineering team knows the actual condition; the finance team uses the assumed life.

Second, even where depreciation is correctly calculated, the resulting charge is rarely fully funded. The cash generated through operations, rates, fees, grants, is often consumed by operating expenditure, leaving little or nothing to set aside for future capital renewal. A council can report a depreciation expense of $20 million in its income statement while spending only $8 million on capital renewal. Unless someone draws the two figures together and asks why the gap exists, the problem goes unnoticed.

Third, and most fundamentally, depreciation as an accounting concept and asset renewal as an engineering imperative do not align perfectly even in principle. A componentised asset might have some components depreciating rapidly while others are essentially indefinite life. The accounting treatment is a simplification of a complex physical reality, and the simplification introduces systematic errors that compound over time.

Asset Register Quality and Ownership

The asset register is the document that most clearly exposes the disconnect between engineering and finance. It should simultaneously serve as the engineering record of what exists, what condition it is in, and when it needs renewal, and as the financial record of what each asset cost, how it has been depreciated, and what it is currently worth on the balance sheet.

In practice, most local government asset registers serve neither purpose well. Neither the engineering team nor the finance team maintains them with full ownership; each tends to update its own fields while leaving the other’s fields stale. Engineers update condition ratings when they inspect assets. Finance officers update depreciation calculations at year end. Nobody reconciles the two. The result is an asset register that is internally inconsistent, condition data suggesting renewal is needed in five years, while the financial data shows the asset has 25 years of depreciation remaining.

Asset revaluations, which are required periodically under Australian Accounting Standards, provide a forced point of reconciliation, but they are typically conducted by external valuers who may have limited engagement with the engineering team’s condition data. A valuer might use unit rate methodologies to estimate replacement cost and apply a condition factor to derive fair value, but if the condition data in the asset register is out of date or unreliable, the resulting valuation is built on uncertain foundations.

Political Economy and Incentive Structures

There is a political economy dimension to the disconnect that is rarely acknowledged but is deeply important. Councils are political organisations, governed by elected representatives who face four-year election cycles. Infrastructure renewal is unglamorous, fixing things that are deteriorating is invisible to ratepayers, whereas building new things is tangible and electorally appealing. There is a systematic political incentive to underfund maintenance and renewal and to direct capital spending to new projects, regardless of what the asset management plan says.

Finance and accounting officers who model the long-term consequences of under-investment in renewal, increasing the infrastructure renewal gap, understating depreciation, or deferring revaluations may face institutional pressure to soften their findings. Engineers who produce renewal forecasts that would require uncomfortable rate increases may find their capital works program cut in successive budget rounds. Neither group has strong institutional protection against this pressure.

The result is what infrastructure economists call optimism bias in reverse, not the overstatement of benefits that afflicts major project planning, but the systematic understatement of future costs that afflicts ongoing asset management. The true long-term cost of owning and renewing the asset base is never fully disclosed, because neither the engineering team nor the finance and accounting team has both the data and the organisational authority to force the disclosure.

Skills Gaps and Resourcing

Local government, particularly small to medium-sized rural and regional councils, often lacks the specialist skills to manage the intersection of engineering and finance competently. A large metropolitan council might have dedicated asset management officers, infrastructure economists, and strategic finance analysts who between them span the two disciplines. A smaller council might have a works manager who doubles as asset manager, and a finance and accounting officer who handles everything from payroll to financial statements.

Under these conditions, sophisticated asset management, which requires condition-based deterioration modelling, long-term financial modelling of renewal needs, scenario analysis of funding options, and integration of engineering and financial data into a coherent long-term financial plan, is simply beyond organisational capacity. Councils in this position default to compliance: producing asset management plans because they are required to, maintaining asset registers because auditors require them, calculating depreciation because accounting standards require it, but never integrating the three into a living financial picture of the infrastructure portfolio.

Regulatory Framework Gaps

The regulatory framework governing local government in Australia has historically treated engineering asset management and financial asset management as parallel but separate obligations. Asset management plans are required under state government guidelines and are commonly informed by standards such as the IPWEA International Infrastructure Management Manual. Financial reporting is governed by Australian Accounting Standards (AASB 116, AASB 13, AASB 1051) and audited by state audit offices. The two regulatory streams rarely speak to each other in a way that compels integration at council level.

The NSW Audit Office’s observation in the 2025 Capital Projects Report highlights that current arrangements for reporting and oversight of major infrastructure projects do not adequately address their scale, complexity and risk profile, underscoring a persistent regulatory and governance gap in how capital spending is planned and monitored.

What Good Practice Looks Like

The disconnect is bridgeable, but it requires deliberate institutional design. Organisations that manage it well typically have a Chief Asset Officer or equivalent role that spans engineering and finance and accounting, integrated asset management systems that feed both engineering and financial data from a single source of truth, long-term financial plans that are directly derived from asset management plans rather than prepared independently of them, and depreciation rates that are calibrated against engineering condition data and reviewed when condition assessments are updated.

The fundamental insight is that every physical decision about an asset, to maintain it, to defer maintenance, to renew it, to dispose of it, has financial consequences, and every financial decision about an asset, how to fund it, how to depreciate it, how to value it has physical consequences. Until local government organisations are structured so that both consequences are routinely visible to the same decision-makers, the disconnect will persist and its costs will continue to accumulate silently in asset registers, renewal backlogs, and ultimately in rate increases and service failures that ratepayers eventually bear.

About the Author

Paul Vorbach is the Managing Director of AcademyGlobal, a Sydney-based capability development firm established in 2004 and the CIPS Centre of Excellence for ANZ. Since 2005, Paul has trained contract management, procurement and supply chain professionals across over twenty centuries in five continents. He is Vice President of the Institute of Strategic Risk Management (ISRM) ANZ, Treasurer of the Society for Risk Analysis (SRA) ANZ, and Adjunct Faculty at the Australian Graduate School of Management (AGSM) at the University of New South Wales.